The Shires Extra Long Lead Rope 3m in Purple#Purple
The Shires Extra Long Lead Rope 3m in Black#Black
The Shires Extra Long Lead Rope 3m in Red#Red

Shires Extra Long Lead Rope 3m


RRP £7.99
/
Delivery calculated at checkout.

Size chart

SHIRES SIZE GUIDE

Horse Rugs -

 Bottom measurement (feet)

Bottom measurement (inches)

Back measurement (cm)
3'9 45" 90
4'0 48" 95
4'3 51" 100
4'6 54" 105
4'9 57" 110
5'0 60" 115
5'3 63" 120
5'6 66" 125
5'9 69" 130
6'0 72" 135
6'3 75" 145
6'6 78" 150
6'9 81" 155
7'0 84" 165
7'3 87" 170

 

Turnout Rug Neck Compatibility -

Neck Size Rug Size
S 4'6-5'0
M 5'3-5'9
L 6'0-6'6
XL 6'9-7'3

 

  Ladies Sizing -

Shires Size  Size Chest Size (in) Waist Size (in) Hip Size (in) Euro Size US Size
XXXS 4 28 22 32 32 0
XXS 6 30 24 34 34 2
XS 8 32 26 36 36 4
S 10 34 28 38 38 6
M 12 36 30 40 40 8
L 14 38 32 42 42 10
XL 16 40 34 44 44 12
XXL 18 42 36 46 46 14
XXXL 20 44 38 48 48 16

 

Childrens Sizing - 

 Shires Size Age Height (cm) Chest (in) Waist (in)
XXXS 2-3 95 20 20
XXS 3-4 105 22 21
XS 5-6 115 24 22
S 7-8 125 26 23
M 9-10 135 28 24
L 11-12 145 30 26
XL 13-14 155 32 28

 

Mens Sizing -

Shires Size UK/US Size Chest Size (in) Waist (in) Euro Size
XXS 34 34 28 44
XS 36 36 30 46
S 38 38 32 48
M 40 40 34 50
L 42 42 36 52
XL 44 44 38 54
XXL 46 46 40 56
XXXL 48 48 42 58

 

Digby & Fox/Shires Greyhound Collars -

Size Fits neck (cm)
XS 21-24
S 25-28
M 29-34
L 35-39

 

Digby & Fox/Shires Rolled and Padded Collars -

Size Fits neck (cm)
XXXS 17-22
XXS 23-28
XS 29-34
S 35-40
M 41-46
ML 47-52
L 53-58
XL 58-64
XXL 65-70

 

 Digby & Fox/Shires Flat, Tweed, Plaited, Cow Hair, Polo Collar -

Size Fits neck (cm)
XXS 20-28
XS 26-34
S 32-40
M 38-46
L 44-52
XL 50-58
XXL 56-64

 

Digby & Fox/Shires Fleece Dog Jumper -

 Size Back length (cm) Tummy depth (cm) Neck circumference (cm) Breed fit (guide only)
XXXS 30 22 27 Yorkshire Terriers, Miniature Dachshunds, Shih Tzu, Bichon Frise
XXS 35 25 32 Jack Russell, Pug, Miniature Schnauzers, Westie
XS 40 28 37 Schnauzer, Border Terrier, Cavalier, Pug
S 45 31 42 Bull Terriers, Poodles, Cocker Spaniels, Beagle, Corgi
M 50 34 47 Basset Hound, Springer Spaniel, Bull Dog
L 55 37 52 Boxer, Pointer, Labrador, Poodle
XL 60 40 57 Golden Retriever, Airedale, German Shepherd
XXL 65 43 62 Rottweiler, Doberman, Weimaraner, Mastiff

 

Digby & Fox/Shires Dog Coats (Quilted, Waterproof, Towel, Padded, Softshell)-

 Size Back length (cm) Tummy depth (cm) Chest depth (cm) Breed fit (guide only)   
XXXXS 25 17 5 Puppies, Tea Cup Breeds, Chihuahua
XXXS 30 19 6 Yorkshire Terriers, Miniature Dachshunds, Shih Tzu, Bichon Frise
XXS 35 20 6.5 Jack Russell, Pug, Miniature Schnauzers, Westie
XS 40 23 7 Schnauzer, Border Terrier, Cavalier, Pug
S 45 26 8 Bull Terriers, Poodles, Cocker Spaniels, Beagle, Corgi
M 50 29 9 Basset Hound, Springer Spaniel, Bull Dog 
L 55 33 10 Boxer, Pointer, Labrador, Poodle
XL 60 35 12 Golden Retriever, Airedale, German Shepherd
XXL 65 37 14 Rottweiler, Doberman, Weimaraner, Mastiff

 

Digby & Fox/Shires Greyhound Dog Coats -

 Size Back length (cm) Tummy depth (cm) Chest depth (cm)
XXXS 48 16 9
XXS 51 17 10
XS 58 18 12
S 61 19 14
M 65 20 16
L 68 26 18
XL 71 28 19
XXL 78 29 20
Colour

4 In Stock - Get it by Wednesday 18 November with Priority Delivery

4 In Stock - Get it by Wednesday 18 November with Priority Delivery

Shires Extra Long Lead Rope 3m


UK Delivery from £3.99*

 
Economy Delivery
5-10 Working Days *
Standard Delivery
3 - 5 Working Days *
Priority Delivery
1-2 Working Days *
Orders Over £75
Small Packet
Approx 0kg - 2kg
£3.99 £4.99 £9.99 Free
Medium Parcel
Approx 2kg - 5kg
£4.99 £5.99 £9.99 Free
Large Parcel
Approx 5kg - 20kg
£5.99 £7.99 £9.99 Free
Parcels 20kg +
Calculated at Checkout
Calculated at Checkout
Calculated at Checkout
Calculated at Checkout

Offshore, Highlands & Remote Postcodes

Due to the extra charges and restrictions imposed by our courier for some Highland, Remote and Offshore postcodes, delivery surcharges may be applied for parcels that are sent via our courier. We may be unable to ship some larger items to these areas, and unfortunately we are not able to offer Free Delivery to these postcodes. All available delivery options and costs for your chosen items will be shown during checkout.

Highlands, Remote & Offshore Postcodes include Channel Islands, Northern Ireland, Scottish Highlands and UK Islands, as covered by the following postcode areas: AB30-38, AB41-56, BT, FK17-99, G83, GY, HS, IM, IV1-28, IV30-56, IV63, JE, KA27-28, KW1-17, PA20-49, PA60-78, PH1, PH5-10, PH15-26, PH30, PH31-44, PH49-50, TR21-25, ZE


You can order to collect in any of our retail stores for FREE!

Place your order online and collect your items for free from your local Millbry Hill store. For items stocked at your local store, Click & Collect orders placed before 2:00pm are usually available for collection the same day. Orders placed after 2:00pm, are normally available the following day.


The Shires Extra Long Lead Rope is an essential tool for long distance horse training. The 3m length and brass swivel trigger clip provide ultimate control and help keep your horse safe and secure. An indispensable part of any equestrian's tack box.



PLEASE NOTE: Questions posted via this form will be made public - please do not post personal details. We cannot answer questions relating to specific orders via this form - if you have questions about your order, please email sales@millbryhill.co.uk or message us via our live chat.

Your recently viewed items